Restart Life Cycle Operation - Failures

Hi Team,

I have been Installation many IS’s using Composite Templates.
Entire cycle of Applying template and restart Life cycle operations are not getting completed.

I have been observing this strange behavior where after template is applied successfully. Restart Life cycle errors out after waiting for 300 secs.

And this behavior is not consistent. Sometimes i dont get any error for Life cycle operations.

Attached is the Screenshot and detailed error logs.

Logs indicate that SPM is not able to find Wm-monitor component — But that component is visible on the SPM.

Please Advice on how to fix this issue.

Error_CCE.docx (93.9 KB)

We have similar issue reported by other customer (SI: 5241340 )
We’ve released a test patch, which is pending verification.
Once the patch is verified we’ll release as official fix for 9.10.

Hi Nikolay,

Thank you. Please do let me know when fix will be available.

Hello team,

Can anyone let me know about the release of this fix.

Regards

Hi Krishnendu
Yes this is release as part of CCE 9.10 Fix 3.

Many Thanks
Nikolay

Hi Nikolay,

This fix is part of ONLY CCE Bootstrap Installer ?
Is there separate SPM fix file ? Can you tell me the SPM Fix name which we can download and update our Target SPMs, .before we run the Composite Templates.

The bootstrap image with fix 3 is still not available.
You need only to patch CCE with wMFix.CCE_9.10.0.0003-0298 and it’s dependencies. There no need to patch SPM on Target node

Thanks Nikolay,
Please do let us know once wMFix.CCE_9.10.0.0003-0298 and its dependencies are available for download.

wMFix.CCE_9.10.0.0003-0298 (and all required fixes) ares available for download via Empower