Hi there,
I came across a strange issue. I recently developed a process and deployed it without any issues. The process works properly but the diagram showed in MWS looks strange (The links in the process are not as showed in the Designer in the Process Development view).
Designer version is 9.9. Integration server version is 8.2.
Attached you have a screenshot.
Do you have any idea what could be the root cause?