How to handle date related KPI(s)

I have been trying to configure KPI(S) related to DATE. I have looged a date feild in the modeler, and in the KPI configuration marked that field as FACT with Attribute as Last Value. But nothing shows up.

1.) Is there any other procedure to handle DATE related fields

2.) Will this problem occur if DATE related field is used as Dimension

Please advice

Gautam Parnaik

I’m facing this issue as well.
I need to trace timestamps in date format in external doc and measure the time required for different steps or actual business process, and i don’t want the process time in Optimize to prevent discrepancies from actual time.

I’m very much stuck to think of a solution to that.

Any idea?