Hello friends ,
I am trying to enable my SAP connection from IS but as I am enabling I am getting the following error message
Error encountered
[ART.118.5042] Adapter Runtime (Connection): Unable to enable connection resource CAFpoc.sap:connNode_SAP4LIMS.[ART.118.5063] Adapter Runtime (Connection): Unable to start connection CAFpoc.sap:connNode_SAP4LIMS: after 1 attempt(s).[ART.118.5036] Adapter Runtime (Connection): Unable to configure connection manager.[SAP.102.9000] JCo error: (103) RFC_ERROR_LOGON_FAILURE - User account not in validity date If anyone knows about this Error please tell me whats the solution for this problem ThanksPrashant Raghava
Hi,
I am facing this issue, if somebody have an idea,
thanks
When I send idoc to sap, it seems everything received but with this error in IS error
[SAP.102.9000] JCo error: com.sap.conn.jco.JCoException: (112)
RFC_ERROR_REQUEST_CANCELLED: connection with handle 5 [87502197] closed after
cancel
Hi,
I am in a producation environment, so it used to work. I’ve noticed that the idoc was delivered successfuly but I should know why it happens and what does it means?
In sap log, I’ve got only the error I’ve post before.